Book Now And Pay Later In Gyatri Aura
Gayatri Aura Presents Possession Linked Plan
Only For Few Units
Complete 40% in 45 Days and Pay Rest Amount on
Possession
Welcome to Gayatri Aura
Living in a resort style environment
Its a privileged resident of the Gayatri Aura, Noida
Ext. residential community, you have the pleasure of accessing a dazzling
variety of recreational facilities where you can soak in the evening either
socializing with friends and neighbors in the party rooms & community
halls, workout in the health club well-equipped with state-of-the-art
facilities or pamper.
Gayatri Aura Overview
Promoted by Gayatri Hospitality and Realcon Ltd.
(GHAR Ltd..)
· Located at prime location of Sector – 1, Noida Extension
· A world-class leisure and residential community spread out over approx
17.5 sprawling acres
· Well planned (1920 flats of 2, 3, 4 bedroom) apartment towers spread
over a green area, is one of the best housing developments in the
city.
· Envisioned as a complete, self-contained campus area built around the
best of facilities where every home is designed to the most demanding standards
· Comprises of upscale, well appointed apartments with modern conveniences
such as a clubhouse, jogging track, swimming pool and more
Layout-1195 Sq Ft
Housing
Project At Plot No. GH-11, Sector -1, Noida Extension
Prices * (w. e. f. 01-12-2012) FLOORS
DOWN PAYMENT
Rs per sq. ft
FLEXI
(Rs per sq. ft.)
CLP
(Rs per sq. ft.)
22nd FLOOR
2890
3060
3225
21st FLOOR
2900
3070
3235
20th FLOOR
2910
3080
3245
19th FLOOR
2920
3090
3255
18th FLOOR
2930
3100
3265
17th FLOOR
2940
3110
3275
16th FLOOR
2950
3120
3285
15th FLOOR
2960
3130
3295
14th FLOOR
2970
3140
3305
13th FLOOR
2980
3150
3315
12th FLOOR
2990
3160
3325
11th FLOOR
3000
3170
3335
10th FLOOR
3010
3180
3345
9th FLOOR
3025
3195
3360
8th FLOOR
3040
3210
3375
7th FLOOR
3055
3225
3390
6th FLOOR
3070
3240
3405
5th FLOOR
3085
3255
3420
4th FLOOR
3100
3270
3435
3th FLOOR
3115
3285
3450
2th FLOOR
3130
3300
3465
1th FLOOR
3145
3315
3480
Housing
Project At Plot No. GH-11, Sector -1, Noida Extension
Prices * (w. e. f. 01-12-2012) FLOORS
|
DOWN PAYMENT
Rs per sq. ft
|
FLEXI
(Rs per sq. ft.)
|
CLP
(Rs per sq. ft.)
|
||
22nd FLOOR
|
2890
|
3060
|
3225
|
||
21st FLOOR
|
2900
|
3070
|
3235
|
||
20th FLOOR
|
2910
|
3080
|
3245
|
||
19th FLOOR
|
2920
|
3090
|
3255
|
||
18th FLOOR
|
2930
|
3100
|
3265
|
||
17th FLOOR
|
2940
|
3110
|
3275
|
||
16th FLOOR
|
2950
|
3120
|
3285
|
||
15th FLOOR
|
2960
|
3130
|
3295
|
||
14th FLOOR
|
2970
|
3140
|
3305
|
||
13th FLOOR
|
2980
|
3150
|
3315
|
||
12th FLOOR
|
2990
|
3160
|
3325
|
||
11th FLOOR
|
3000
|
3170
|
3335
|
||
10th FLOOR
|
3010
|
3180
|
3345
|
||
9th FLOOR
|
3025
|
3195
|
3360
|
||
8th FLOOR
|
3040
|
3210
|
3375
|
||
7th FLOOR
|
3055
|
3225
|
3390
|
||
6th FLOOR
|
3070
|
3240
|
3405
|
||
5th FLOOR
|
3085
|
3255
|
3420
|
||
4th FLOOR
|
3100
|
3270
|
3435
|
||
3th FLOOR
|
3115
|
3285
|
3450
|
||
2th FLOOR
|
3130
|
3300
|
3465
|
||
1th FLOOR
|
3145
|
3315
|
3480
|
||
Other
Applicable Charges
Open Car Parking
|
Rs. 100000/
|
Free
|
Covered Car Parking
|
Rs.200000/-
|
Payable
|
Power back up-1kva
|
Rs 15000/- 1kva
|
Free
|
Club Membership
|
Rs. 75000
|
Free
|
Lease Rent
|
Rs. 50/- sq. ft.
|
Payable on possession
|
Fire Fighting Charges
|
Rs. 40/- sq. ft.
|
Free
|
External Development
Charges
|
Rs. 50/- sq. ft.
|
Free
|
IFMS
|
Rs. 20/- sq. ft.
|
Payable
|
Preferential Location Charges
Park facing /Pool facing
|
Rs. 60/- sq. ft.
|
Road facing
|
Rs. 40/- sq. ft.
|
Corner charges
|
Rs. 40/- sq. ft.
|
PAYMENT PLANS
(A) Possession Linked Plan
|
|
At the time of Booking
|
10% of Total Cost
|
Within 45 Days of Booking
|
30% of Total Cost
|
On offer of Possession
|
60% of Total Cost
|
(B) DOWN PAYMENT PLAN (DP)
|
|
At the time of Booking
|
10% of Total Cost
|
Within 45 Days of Booking
|
85% of Total Cost
|
On offer of Possession
|
5% of Total Cost + Other
Charges
|
(C)FLEXI PLAN
|
|
At the time of Booking
|
15% of Total Cost
|
Within 45 Days of Booking
|
25% of Total Cost
|
On casting of Basement
Slab
|
6% of Total Cost
|
On Casting of 1st Floor
Roof
|
6% of Total Cost + 50% PLC
and other charges
|
On Casting of 5th Floor
Roof
|
6% of Total Cost
|
On Casting of 7th Floor
Roof slab
|
6% of Total Cost
|
On Casting of 11th Floor
Roof slab
|
6% of Total Cost + 50% PLC
and other charges
|
On Casting of 13th Floor
Roof slab
|
6% of Total Cost
|
On Casing of 15th Floor
Roof slab
|
6% of Total Cost
|
On Casting of Plaster of
Booked Flat
|
6% of Total Cost
|
On Casting of Flooring of
Booked Flat
|
6% of Total Cost
|
At the time of Possession
|
6% of Total Cost + IFMS +
Other charges if any.
|
(D)CONSTRUCTION LINKED
PLAN (CLP)
|
|
At the time of Booking
|
10% of Total Cost
|
Within 45 Days of Booking
|
10% of Total Cost
|
On Excavation of
Foundation
|
10% of Total Cost + 25%
PLC and other charges
|
On Casting of 1st Floor
Roof
|
10% of Total Cost + 25%
PLC and other charges
|
On Casting of 3rd Floor
Roof
|
10% of Total Cost
|
On Casting of 5th Floor
Roof slab
|
10% of Total Cost + 25%
PLC and other charges
|
On Casting of 7th Floor
Roof slab
|
10% of Total Cost
|
On Casting of 10th Floor
Roof slab
|
10% of Total Cost + 25%
PLC and other charges
|
On Casing of 13th Floor
Roof slab
|
10% of Total Cost
|
On Casting of Internal
Plaster
|
5% of Total Cost
|
At the time of Possession
|
5% of Total Cost + IFMS +
Other charges if any.
|
Specifications Gayatri Aura
Kitchen
·
Granite working top with stainless steel
sink
·
2ft dado ceramic tiles above the working
top
·
Individual R.O. unit for drinking water
·
nternal LPG pipeline
Flooring
·
Vitrified tiles in Drawing, Kitchen &
Bedrooms
·
Wooden laminated flooring in Master Bedroom
·
Ceramic tiles in Toilets & Balconies
External Finish
·
Excellent weatherproof finish in pleasant
shades
Structure
·
Earthquake resistant R.C.C. framed
structure
Walls & Ceiling Finish
·
Finished walls & Ceilings with OBD in
pleasing shades
·
One wall in Master Bedroom duly textured
finished
Doors & Windows
·
Outer doors and windows aluminum powder
coated/UPVC
·
Internal door frames of wood
·
Internal door made of painted flush
shutters
·
Main entrance door frame of wood with skin
molded door shutter
·
Good quality hardware fittings
Electrical
·
Copper wire in PVC Conduits with MCV
supported circuits and adequate number of points and light points in ceiling
Toilets
·
Provision for hot & cold water system
·
Ceramic tiles on walls up to door height
·
White sanitary ware with EWC, Washbasin and
CP fittings of standard make in all Toilets
Water Supply
·
Under ground and overhead water tanks with
pumps for 24 hrs, uninterrupted water supply
TV & Telephones
·
One land line connection having Intercom
facilities
·
Provision for DTH connection

